(Bryan Waryjasz(above) doing final module checks at Adams Wastewater Treatment Facility)

 

BPVS recently finished installing a 7.05kW solar electric array on the uppermost roof at the Adams Wastewater Treatment Facility.  The array consisted of 30 Schott-Poly 235 watt modules on a custom mounting system that was designed and constructed by BPVS integrated with parts from Ecofasten and Direct Power.  The power produced by this system will help reduce the towns overall electricity consumption as well as lessening the environmental impact of Adams, MA.

 

Posted By: NG . (2011-08-11)